Handling Technique of Erosion Potential and Sedimentaton in Post Mining Land

2 months ago - 26 - 28 March 2019
View Poster Detail

Description

IPB Training menyelenggarakan Handling Technique of Erosion Potential and Sedimentaton in Post Mining Land pada 26 - 28 March 2019 di IPB Science Techno Park Jalan Taman Kencana nomor 3, Bogor. Kegiatan ini bertujuan agar participants obtained an overview of the techniques for handling erosion potential and sedimentation on post mining land

Participant

Disarankan mengikuti pelatihan ini :: Health, Safety and Environment , Planning Division , Consultant and mine reclamation contractor , Revegetation Contractor .

Topik (6)

Disajikan dengan metode presentasi dan diskusi (60%), praktek dan simulasi (40%), diantaranya:

  • 1

    Erosion and Sediment Control Methods

  • 2

    Sediment Control Monitoring

  • 3

    Estimation of Soil Erosion

  • 4

    Measurement of Erosion and Sedimentation Settling Pond Design Measurement of Total Suspended Solids (TSS)

  • 5

    Types of LCC Plant as Erosion Control

  • 6

    Sharing Session : Practical Experience in Erosion and Sedimentation Control in Post Mining Land


Trainer (1)

Wahyu Purwakusuma (Ir MSc)

Ilmu Tanah, Pengelolaan DAS, Pengelolaan Air dan Lingkungan

4.5 (2 Reviews)

Kukuh Murtilaksono (Prof Dr MSc)

Pakar konservasi tanah dan air, pengelolaan daerah aliran sungai

4 (2 Reviews)

Herdhata Agusta (Dr Ir)

-

4 (2 Reviews)


Location


Sign In